Office and residential complex at Novatorov street
Advantages:
- Location – South-West, close to the intersection of Leninskiy Prospect and Novatorov Street
- Close to Prospect Vernadskogo and Profsoyuznaya Street
- 7 minutes by bus/car to ‘Prospect Vernadskogo’, ‘Noviye Cheremushki’ and ‘Kaluzhskaya’ underground stations
- Location in an ecologically clean district, in the guarded zone of Vorontsov park
- Close to the Italian, Japanese, German Embassy schools
- Close to the German consulate, the Moscow Chamber of Trade and Commerce
- Convenient access to the Vnukovo airport
- Prospectively there’ll be convenient access to the 4-th ring road
- Professional management of the building
- Cutting-edge security and access control systems
Features of the Complex
- Monolith outside walls
- 9 sections of floors
- Office space – flexible planning, location on the 1-st and 2-d floors. Height of ceilings is 3.3 meters
- Height of ceilings in the apartments – 3 meters
- 277 underground parking lots, car wash is planned
- HVAC system, climate control
- Sprinkle fire fighting systems
- Cutting-edge, high-speed, quiet elevators
- Windows with triple glass
- 2-d category of power supply
- Central heat point
- TV control, security alarm system, videophone, magnetic cards for access to the building, apartments and offices
- Automatic control of engineering equipment
- Mechanic and chemical filters for water and air purification
- Fiber-optic communication, unlimited number of telephone lines
- Satellite TV
General structure of the Complex
Total territory – 2 hectares
Total area of the Complex – 46.712 sq.m.
Office part
Area for rent: 5.241 sq.m.
Offices of 50-200 sq.m., organizing more spacious office blocks is an option.
Residential part
Area for rent: 19.693 sq.m.
2-5-room apartments, total number of apartments – 164.
Infrastructure
Total area – 1.806 sq.m.
Parking
Underground – for 277 cars, total area – 8.004 sq.m.
For guests – 50 cars
Objects:
- Daycare center
- Supermarket (700 sq.m.)
- Video/DVD distribution office
- Photoshop (15 sq.m.)
- Pharmacy (15 sq.m.)
- Courier post (15 sq.m.)
- Fitness center (300 sq.m.) and beauty parlor
- Café-bar (200 sq.m.)
- Laundry & dry cleaner (20 sq.m.)
- Manual car wash
End of construction – 2010.






